Bramba HPP

•    Start time: 2006
•    Completion time: 2006
•    Client: SakHydroEnergyMsheni


A mini Bramba HPP was built in Kodori Canyon near the estuary between the Kodori and the Bramba. The installed capacity of the hydropower unit is 500 kw. 
The guide vane comprises front and rear turbine covers, an adjusting ring, guide blades, blade levers, a servomotor, and other details.  
The power unit comprises two rooms: a machine room located in the powerhouse and a transformer room, a high voltage room – in the open part of the powerhouse. The ballast block is out of the HPP structure. The power unit has both manual and automatic operating modes.