Pipelines
Baku-Tbilisi-Ceihan Pipeline
Tunnels
Khadori Tunnel
Hydro Power Plants With Small and Average Capacities
Khadori hydro power plant.
Hydro Power Plants With Small and Average Capacities
Construction of a 24MW Khadori hydro power plant.
Hydro Power Plants With Small and Average Capacities
Construction of Sakeni HPP (1.6 Mw).
Hydro Power Plants With Small and Average Capacities
Rehabilitation of Kekhvi HPP (0.9 Mw).
Hydro Power Plants With Small and Average Capacities
Rehabilitation of Chkhorotskhu HPP (5.6Mw).
Hydro technical Structures
Construction of Misaktsieli Protection Dam.
Hydro technical Structures
Construction of protection dam of Saguramo water reservoir (Rip Rap, ground dam).
Hydro technical Structures
Construction of Protection Dam on the riv. Aragvi (Rip Rap, ground dam).
Hydro technical Structures
Rehabilitation of protection dam on the riv. Abasha with the length of 1200m.
Pipeline
Construction of Poti Gravity Flow Water Supply System (47km pipeline).
Buildings
Construction of Visitor Center and Administrative Building of the Kolheti wetlands protected areas
Manufacturing and Installation of Electro Mechanical Equipments
Manufacturing and Installation of Electro Mechanical Equipments
Roads
Roads
Roads
Construction of Chair Lift
Water supply systems
Rehabilitation of Borjomi Water Supply System
Water supply systems
Rehabilitation of Borjomi Water Supply System (II phase – Network)

It had begun implementation of the ISO 9001:2008 Quality Management System international Standard to the company at the beginning of 2007 year, which completed with the Peri Ltd. certificates and the company received ISO 9001:2008 Quality international certificate at September 2007.



2010 PERI. All Rights Reserved Created By HAPPY